Protective Relay Training - Basic
Our customized live online or in‑person group training can be delivered to your staff at your location.
- Live Online
- 12 hours Instructor-led
- Group Training Available
No one was injured by the fire, which was extinguished quickly by an automatic sprinkler system as per design. As a result of the event, which occurred on the non-nuclear side of the plant, some insulating oil has entered Lake Huron, likely through a storm drain. The insulating oil contains no PCBs or radioactive material and consists primarily of mineral oil. Bruce Power crews plugged the drain and set up a boom in the station's outflow to contain the material, which formed a thin sheen on the surface of the water.
Bruce Power officials have reported the event to the Canadian Nuclear Safety Commission as required and Hydro One maintenance crews have also been called in to replace the transformer. It is not yet known how long Unit 6 will remain offline.
Units 3, 5, 7 and 8 remain at high power while the planned inspection on Unit 4 that began March 12 continues.
Related News
Germany is first major economy to phase out coal and nuclear
New England's solar growth is creating tension over who pays for grid upgrades
Adani Electricity's Power Supply Cuts in Mumbai
Canada-U.S. Electricity Trade Adapts to Grid Pressures
IEC reaches settlement on Palestinian electricity debt
Renewable power surpasses fossil fuels for first time in Europe
Sign Up for Electricity Forum’s Newsletter
Stay informed with our FREE Newsletter — get the latest news, breakthrough technologies, and expert insights, delivered straight to your inbox.
Electricity Today T&D Magazine Subscribe for FREE
- Timely insights from industry experts
- Practical solutions T&D engineers
- Free access to every issue